Case studies · measured, not modelled
Verified in the building.
Not in a model.
Every number below is measured against the building’s own baseline, weather-normalised, and reported the way our clients report it.

Warsaw Unit, Warsaw
Eastnine AB · 60,100 m² lettable · 202 m · BREEAM Outstanding · WELL Core v2 Platinum
−15%
Energy use
€210K
Saved per year
240 t
CO₂e avoided
€0
Capex
Already one of the greenest towers in Poland, and still running on fixed schedules. Exergio layered onto the existing BMS, with no hardware and no disruption, and found 15% in the control logic. Savings are calculated to IPMVP Option C against a twelve-month baseline.

More verified results

20%
Energy savings


21%
Energy savings

21%
Energy savings


37%
Energy savings
